Balance Production Rates Video and Worksheet
Join TXAPA’s Director of Engineering and Technology Jim Warren for an in-depth look at the importance of balancing asphalt production rates (plant, trucking, paving, and compaction) relative to quality improvement. Jim will review several case studies and integrate the concept of “time available for compaction” and how that condition can actually be used to set maximum production rates. He will also incorporate a discussion of Multi-Cool software, other apps, and programs.
The spreadsheet referenced in this webinar can be accessed here.