2013 TxDOT-TXAPA Quality Pavement Awards

Home Knowledge Base 2013 TxDOT-TXAPA Quality Pavement Awards

Latest Posts

2023-24 TXAPA Awards

Drunk Driving

TxDOT Letting Report 2024 December

TxDOT Spec Update for Tex-250-F, Ideal Cracking Test, and Item 300

Laboratory Safety

Full Depth Large

TxDOT – Central Texas
Industrial Asphalt
Ramming Paving Co.
Toll Road SH 130
Tonnage: 1,777,582

Full Depth Small

TxDOT – Yoakum District
Hunter Industries
Colorado Materials
US 77
Tonnage: 20,831

Overlay Large

TxDOT – Yoakum District
Hunter Industries
Colorado Materials
US 87
Tonnage: 25,841

Overlay Large Open Graded

TxDOT – Wichita Falls District
Duininck, Inc.
Us 287
Tonnage: 26,516

Overlay Small

TxDOT – Atlanta District
Longview Asphalt
SH 43
Tonnage: 18,483

Overlay Small Open Graded

TxDOT – Tyler District
Clark Construction Co.
Longview Asphalt
IH 20
Tonnage: 10,058.07